![]() In addition, its emergency response staff coordinates with other government agencies and the private sector to address environmental emergencies, such as the release of toxic chemicals. In 2019, it became the Arkansas Division of Environmental Quality under the ADEE.ĪDEQ has faced criticism over the years for not doing enough to protect the state’s environment, as in 2008 when it issued an air permit for a proposed coal-fired power plant in Hempstead County and later when it allowed a hog farm to operate in the Buffalo River watershed from 2013 to 2018.ĪDEQ maintains six regulatory divisions covering air, hazardous waste, mining, regulated storage tanks, solid waste, and water. The Arkansas Energy Office was moved under the ADEQ in 2017. In 2007, ADEQ moved into its new headquarters in North Little Rock. In 1999, the department’s name was changed yet again, this time to the Arkansas Department of Environmental Quality. During the 1970s, the department was given the responsibilities of regulating coal mining and hazardous waste disposal, and, in 1989, it was also made responsible for regulating underground petroleum tanks. In 1971, the Department of Pollution Control and Ecology was established. It explicitly forbade, however, the commission from enforcing laws regarding agricultural operations, land clearing operations, road construction, and a few other such activities. However, the commission comprised three gubernatorial appointees “representing industry, municipalities, and agriculture and livestock interests”-who often had little motivation to regulate pollution-as well as a member each from the State Board of Health, Game and Fish Commission, Oil and Gas Commission, and Resources and Development Commission.Īct 183 of 1965 changed the commission’s name to the Arkansas Pollution Control Commission and gave it the power to regulate air pollution the act also made the commission a separate agency and expanded it from seven to eight members. Originally operating under the auspices of the Arkansas Department of Health, the commission was given the power to “administer and enforce all laws relating to the pollution of any waters in the State,” investigate pollution, establish pollution standards, and “prepare a comprehensive program for the elimination or reduction of pollution” in state waters. ![]() ADEQ operates seventeen field offices throughout the state.ĪDEQ’s first incarnation was the Arkansas Water Pollution Control Commission, created by Act 472 of 1949. It is headquartered in North Little Rock (Pulaski County) in the state government’s first “green” building. The Arkansas Division of Environmental Quality (ADEQ) is Arkansas’s regulatory body in the area of environmental protection. Additional information can be found in our FAQ on e-signature approval.įor air permitting issues, go to the Air Permits Branch page of ePortal.Established in 2019 as part of the Transformation and Efficiencies Act of 2019 (Act 910), the new umbrella agency called the Arkansas Department of Energy and Environment (ADEE) absorbed the former Arkansas Department of Environmental Quality (ADEQ), which became a division, and the Arkansas Geological Survey. Responsible Official requirements are contained in the on-line form and regulations. E-signature is only an authentication of the person's identity. E-signature does not convey any authorization or approval to submit or certify environmental records, such as a designation of Responsible Official. To obtain this approval, you must download the DEQ electronic signature agreement (see additional links below) and mail it to DEQ. To submit some forms you must have e-signature approval. Upset Condition Report for reporting upset conditions in excess of thirty (30) minutes.Air Compliance Title V Semi-Annual Monitoring (SAM) Report for 6-month Title V air permit monitoring reports.Air Compliance Annual Compliance Certification (ACC) Report for annual Title V air permit certifications.Reports that do not require certifications including:Ĭonstruction, Initial Startup or Other Notifications Reports, Notifications and other Non-Certified Compliance Submittals.Reports that require certifications and are not included in a Title V facility's SAM report. NSPS/MACT and Other Certified Reports. ![]() CEM Testing Protocol Form Including PST, RATA, RAT, RAA and CGA tests.To fill out and mail in a paper copy of a form, select the Download Mail-in Form option at the bottom of the form.To complete an form on-line, select the Begin Form Entry option at the bottom of the form.To access forms, select (click on) the desired notification/report/form. (Do not submit confidential information through ePortal, refer to FAQs for details)įorms for submitting Air Compliance Branch Notifications and Reports can be found under the Forms section of this page below. NOTIFICATIONS, REPORTING FORMS AND INSTRUCTIONS
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |